Surveying: Established up to 75 ground control points to support the photogrammetric mapping. Tie horizontal coordinates to the State Plane…
The work included complex maintenance of traffic design and traffic signal design at two intersections, including temporary signals and system…
QEI was the lead on the design. The design included approximately 1 mile in total length with turnarounds, constructing three…
Project Management: Entered a mentor-protégé relationship with URS on this project. QEI’s initial goal was to be better prepared to…
QEI was the sole designer on the project and performed field surveys, prepared right-of-way plats, and prepared construction documents for…
QEI was a Joint Venture Partner that planned and designed a $360M replacement of the 4,940-foot long, 54-span, dual Tollway…