Wolf Road from IL 21 to North of Hintz Road, IDOT District 1

Wolf Road from IL 21 to North of Hintz Road, IDOT District 1
February 21, 2024 Quigg Engineering Inc.
Wolf-Road-from-IL-21-to-North-of-Hintz-Road

The work included complex maintenance of traffic design and traffic signal design at two intersections, including temporary signals and system interconnect at Wolf Road at Strong Street and Wolf Road at Dundee Road. The project also included complete sidewalk reconstruction throughout the project limits and the design of 55 ADA/PROWAG-compliant curb ramps.

Client:  Illinois Department of Transportation, District 1

Location: Cook County, IL

Construction Cost: $12,538,000