QEI reexamined the proposed pavement section and runway width and adjusted the conceptual design to meet the design of aircraft…
Aviation: QEI evaluated the construction impacts of a complete reconstruction of the main parking apron and developed a staged construction…
The O’Hare Modernization Program (OMP) was a 16-year, $6 billion investment that transformed the airfield into a modern configuration, reducing…
QEI collaborated with the City of Chicago and International Gate Control (IGC) on Chicago O’Hare International Airport’s Terminal 5 East…
QEI analyzed aircraft movements, proposed temporary taxi lane centerlines, and coordinated with construction teams to ensure aircraft could safely and…