QEI conducted grade crossing surveying at various locations, acquired the necessary right of entry permits from IAIS, BNSF, all jurisdictional…
Surveying: Established up to 75 ground control points to support the photogrammetric mapping. Tie horizontal coordinates to the State Plane…
QEI provided an Assistant Resident Engineer on this $68M improvement project that consisted of the reconfiguration of the interchange at…
QEI reexamined the proposed pavement section and runway width and adjusted the conceptual design to meet the design of aircraft…
Aviation: QEI evaluated the construction impacts of a complete reconstruction of the main parking apron and developed a staged construction…
The O’Hare Modernization Program (OMP) was a 16-year, $6 billion investment that transformed the airfield into a modern configuration, reducing…
QEI collaborated with the City of Chicago and International Gate Control (IGC) on Chicago O’Hare International Airport’s Terminal 5 East…
QEI analyzed aircraft movements, proposed temporary taxi lane centerlines, and coordinated with construction teams to ensure aircraft could safely and…
QEI prepared Stormwater Pollution Prevention Plan (SWPPP) and Notice of Intent (NOI) Construction General Permit (CGP) documents for over 30…
QEI conducted environmental services, including wetland surveys on approximately 439 acres of the project site, which included wetlands and waters…