QEI provided data collection for the corridor area along with supplemental traffic data to determine bus stop locations and traffic analysis for safe routing of pedestrians along the corridor. The Topographic Survey provided vital information for the design and development of the planned improvements.
Client: HNTB 1 S. Wacker Dr. , Ste. 900, Chicago, IL 60606
Location: Cermak Road Corridor along PACE-Pulse Line in Cook County, IL