NPDES Stormwater Compliance, Ameren

NPDES Stormwater Compliance, Ameren
February 22, 2024 Quigg Engineering Inc.
Ameren NPDES Stormwater Compliance

QEI prepared Stormwater Pollution Prevention Plan (SWPPP) and Notice of Intent (NOI) Construction General Permit (CGP) documents for over 30 electrical power substation and transmission line projects. QEI inspected and monitored on-site erosion and sediment control Best Management Practices (BMPs) during construction and provided technical recommendations to construction contractors to ensure compliance with the SWPPP and EPA NPDES Stormwater CGP requirements.

Client:  Ameren Corporation

Location: Multiple locations throughout Missouri and Illinois