Surveying

  • Cermak Corridor-PACE Pulse Line

    Cermak Corridor-PACE Pulse line, HNTB Corporation

    QEI provided data collection for the corridor area along with supplemental traffic data to determine bus stop locations and traffic…

    by
  • Working on Transmission Lines for Ameren

    Ameren Transmission Lines

    Title: Coffeen-Roxford Transmission Line 4551 QEI reviewed title commitments, researched deeds and surveyed records, conducted field searches and tie-ins of…

    by
  • Chicago to Quad Cities High Speed Rail IDOT

    Chicago to Quad Cities High Speed Rail, IDOT Bureau of Railroads

    QEI conducted grade crossing surveying at various locations, acquired the necessary right of entry permits from IAIS, BNSF, all jurisdictional…

    by
  • Alton to STL High Speed Rail

    Alton to St. Louis High Speed Rail, IDOT Bureau of Railroads

    Surveying: Established up to 75 ground control points to support the photogrammetric mapping. Tie horizontal coordinates to the State Plane…

    by
  • Rochelle Airport

    Apron R/1 Reconstruction, City of Rochelle

    Aviation: QEI evaluated the construction impacts of a complete reconstruction of the main parking apron and developed a staged construction…

    by
  • Elgin O’Hare West Bypass, U.S. Route 20 to IL Route 83, Illinois Tollway

    Elgin O’Hare West Bypass, U.S. Route 20 to IL Route 83, Illinois Tollway

    Project Management: Entered a mentor-protégé relationship with URS on this project. QEI’s initial goal was to be better prepared to…

    by
  • MLB

    I-294 (Tri-State Tollway) Mile Long Bridge Reconstruction, Illinois Tollway

    QEI was a Joint Venture Partner that planned and designed a $360M replacement of the 4,940-foot long, 54-span, dual Tollway…

    by