An Extension of 11th street in Belleville, Illinois. Quigg Engineering Provided Construction Inspections Services. |
|
Branch Creek was a overlay project with the bridge being replaced with a Triple Box Culvert. |
|
This Construction Inspection is scheduled to start in early spring more details to come later. |
|
Quigg Engineering, Inc. completed the Maintenance of Traffic for this project. Traffic had to be maintained because the road bed elevation was raised approximately 2.5’. |
|
Riley Creek was a overlay project with the bridge being replaced with a Triple Box Culvert. |
|
Construction Inspection, Belleville 11 Street |
|
Design, Horseshoe Lake Road Maintenance of Traffic |
|
IDOT District 8, Construction Inspection |
|
Overlay IL. 96 Over Branch Creek |
|
Design, Overlay IL. 96 Over Riley Creek |




|
Current Project List |
|
QEI processed survey data and created a topographic map and a contour map along with a hydraulic survey and R.O.W. |
|
08-34 Epstein PTB 149 21 Phase I II D4 |
|
QEI processed survey data and created topographic maps with contours on various streets and roads for the City of Champaign |
|
City of Champaign |
|
QEI processed survey data and created a topographic map and a contour map. |
|
U.S 34 from Sandwich to Plano |